Back to wiki
Commissions

How long a build takes

About a week at 150×150, two weeks minimum at 400×400, three to four at 600×600.

Reference points, not promises

  • 150×150 — about a week.
  • 400×400 — two weeks at the very least.
  • 600×600 — three to four weeks.

These are the anchors the estimator works between, and they assume a normal amount of detail. A small build packed with interiors can take longer than a large plain one — which is why the instant estimate shows a range rather than a date.

The real timeline also depends on what is already in the queue. That gets agreed with you before work starts, not after.